Paramount Business Complex - Cairo

Egypt

Units 100
Completion Completed

About This Project

Paramount Business Complex is a premium commercial and administrative destination in Sheraton Heliopolis, offering approximately 20,000 sqm of intelligently planned space. Its architecture prioritizes efficiency, adaptability and flow—creating a business environment designed to perform day after day.

Nearby Airport

10 minutes to Cairo International Airport

  • Just off the Heliopolis-Helwan Autostrad connecting to the Ring Road
  • 10 minutes from the Cairo-Ismailia Road connecting to El Obour
  • El Shorouq and 10th of Ramadan Cities
  • 5 minutes from El Orouba Road leading to the City Center
  • 20 minutes from Suez-Ain Sokhna Road leading to New Cairo Capital and Suez Canal zone

Premium Facilities

A complete business ecosystem.

Efficient Arrival

Efficient Arrival

Secure parking, controlled access, refined reception areas and optimized internal circulation.

Fitness Center

Fitness Center

24/7 state-of-the-art gym
24/7 Security

24/7 Security

Advanced security systems
Valet Parking

Valet Parking

Professional valet service
Central AC

Central AC

Premium climate control
Landscaped Gardens

Landscaped Gardens

Beautifully maintained grounds

DESIGN & TECHNOLOGY

  • Sub – Lower Basement contains the water tanks for both domestic use and firefighting tank.
  • Lower Basement for parking.
  • Upper Basement for parking, Plus Gym and Spa.
  • Both basements are equipped with smoke and fresh air fans, Fire Alarm, and Fire Fighting.
  • G and 1st floors: units from 001 to 006 and units 107 to 111 with private entrance (1).
  • Regus Centre is in units (001 and 002) and accessed through entrance (1).
  • 4 typical floors: accessed through entrance (2).
  • The facades of the building are a mix of Aluminum panels cladding and structure glazing panels.
  • Both entrances are with marble floors and walls.
  • The building has 2 Hyundai elevators serving from lower basement to all floors.
  • The building has fire escape stairs accessed from all floors.

  • ELECTRICAL SUPPLY • The building is equipped with two main supply cables from the government electric network with the needed ring room transformers with back up GENROTOR. • Electric panel boards needed for operation. All supplies used are authorized by our consultant electric engineer and relevant codes of practice. • The Electro Mechanical consultant is KEM consultant – “ENG. Khaled El Mawy”.
  • Location Icon